Getting Back Into It

Posted by mitch on March 10, 2013
home

Over the last 25 weeks, I’ve been trying hard to do very little beyond sleep and goof off. Even though I don’t have a job and have been considering myself on vacation, looking back at my calendar, I still managed to do over 100 business-related meetings and spent 4 weeks on the road. Nevertheless, I’ve been relaxing–I bought a Playstation Vita last March and didn’t start playing it until January.

I’m starting to get going on a few projects and as I fiddle around with possible next directions, and come to realize that I don’t have enough desk space to juggle completely different activities that hit creative road blocks. I was at a stand-still most of last week because my desk was covered with a project that wasn’t going anywhere. I needed another desk to dump it on so I can still look at it, but engage on another project while it percolates. Since I’m doing some other remodeling this year, I started looking at reclaiming my closet (which is just a junk room) to pick up an extra 35 sq ft of “spreading out” surface area.

I’m also finding that I have too little in the way of filing space–despite moving most “archive” files into banker boxes and shredding about 60 gallons of files, I still lack sufficient filing space. So this configuration adds a second linear file cabinet.

Some other remodel considerations for the office:

1. Build a large built-in bookcase at the front of the office. In this configuration, it will hold most of my office-related books. Barely–which would be a big improvement over the current situation. Below is a rendering that my architect created of the bookcase. I also plan to reclaim space under the eave to put the stereo without it taking up floor space in the room where it currently resides.

2. Remove the chimney. I should have done this 5 years ago but felt like I had feature-creeped on the first remodel too much as it was. To finish a software release, you have to stop adding crap to the release and get things fixed. The same applies to a remodel.
3. Finally install a split AC system. I got a quote for this years ago, but could never get the fellow to come out and do the work.

Sadly, remodeling in real life isn’t as fast as a few hours of monkeying around in SketchUp… so until then, piles of stuff it is!

If you came to this post hoping to read about what I’m working on and you weren’t happy to hear about goofing off, come back in 25 weeks!

Tags: ,